05Aug

Supplying the sub-networks feeding the vertical drainage wells in the fifth sector

Supplying the sub-networks feeding the vertical drainage wells in the fifth sector, Al-Ashara district, by workers, technicians, and engineers working in the Operation and Maintenance.......

Read More
20Jul

Removing the main channel in the Raqqa irrigation project

Direct removal of the main channel in the Raqqa irrigation project from the eighth regulator in Al-Rahbi to the seventh regulator, east of Al-Dalha....

Read More
11Jul

Distribution of irrigation water after the third engine is running

Distribution of irrigation water after the third engine is running
Distribution for Al-Galaa Farms, Freedom and FriendshipAnd the continuous follow-up by the cadres of the.......

Read More
11Jun

The removal of the main main channel

Under the directives of Professor #Rabie_Al-Ali, Director General of the General Organization for Land Reclamation, and with the follow-up of Engineer Khalil Al-Askar, Director of.......

Read More
04Jun

Remove main channel

The Directorate of Operation and Maintenance of the Upper Euphrates Basin projects has started the process of isolating the main channel feeding the Maskana project.......

Read More
05Mar

Maintenance work in the third sector


Maintenance work for the main and secondary channels carried out by the Directorate of Operation and Maintenance in the Lower Euphrates Basin in the third.......

Read More

latest news